Maddeppungeng, Andi, Indonesia
-
Vol 4, No 1 (2015) - Articles
ANALISIS OPTIMASI BIAYA DAN WAKTU DENGAN METODE TCTO (TIME COST TRADE OFF)
Abstract PDF -
Vol 4, No 1 (2015) - Articles
ANALISIS PENGARUH VALUE CHAIN TERHADAP KEUNGGULAN BERSAING DALAM MENCAPAI KEPUASAN KONTRAKTOR PADA PERUSAHAAN READY MIX BETON DI BANTEN
Abstract PDF -
Vol 4, No 1 (2015) - Articles
PERENCANAAN BUNDARAN PADA SIMPANG (Studi Kasus Jalan Jenderal Sudirman - Jalan Kyai H. Yasin Beji - Jalan Warnasari - Jalan Semang Raya, Cilegon)
Abstract PDF -
Vol 4, No 1 (2015) - Articles
ANALISIS KINERJA SUPPLY CHAIN PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG DENGAN TINJAUAN PADA PEKERJAAN STRUKTUR
Abstract PDF -
Vol 4, No 1 (2015) - Articles
ANALISIS PENGENDALIAN PENJADWALAN PEMBANGUNAN GEDUNG ADMINISTRASI UNIVERSITAS PENDIDIKAN INDONESIA (UPI ) KAMPUS SERANG MENGGUNAKAN METODE WORK BREAKDOWN STRUCTURE (WBS) DAN KURVA-S
Abstract PDF -
Vol 4, No 2 (2015) - Articles
ANALISIS INTEGRASI SUPPLY CHAIN MANAGEMENT (SCM ) TERHADAP KINERJA DAN DAYA SAING PADA INDUSTRI KONSTRUKSI ( STUDI KASUS KONTRAKTOR – KONTRAKTOR DI DAERAH BANTEN DAN DKI JAKARTA)
Abstract PDF -
Vol 4, No 2 (2015) - Articles
IDENTIFIKASI FAKTOR-FAKTOR RESIKO YANG BERPENGARUH DI TAHAP CONSTRUCTION PADA PROYEK EPC TERHADAP KINERJA WAKTU
Abstract PDF -
Vol 5, No 1 (2016) - Articles
ESTIMASI BIAYA PADA PROYEK PERUMAHAN (Studi Kasus Proyek Pembangunan Citra Serang Residence)
Abstract PDF -
Vol 5, No 2 (2016) - Articles
ANALISIS SISTEM DINAMIK KETERSEDIAAN BAJA PROFIL SEBAGAI INFRASTRUKTUR (Studi Kasus : Kota Cilegon)
Abstract PDF -
Vol 5, No 2 (2016) - Articles
PENGARUH TQM ( TOTAL QUALITY MANAGEMENT ) DAN SCM ( SUPPLY CHAIN MANAGEMENT ) TERHADAP DAYA SAING PADA INDUSTRI KONSTRUKSI ( STUDI KASUSPADA KONTRAKTOR BERSERTIFIKAT ISO 9001 DI DKI JAKARTA )
Abstract PDF -
Vol 3, No 2 (2014) - Articles
ANALISIS FAKTOR PENYEBAB RESIKO BIAYA KONTRUKSI PADA PROYEK DENGAN KONTRAK LUMPSUM DAN UNIT PRICE DI KOTA CILEGON MENGGUNAKAN METODE ANALYTIC HIERARCHY PROCESS (AHP)
Abstract Docx -
Vol 3, No 2 (2014) - Articles
PENGARUH RANTAI PASOK TERHADAP KINERJA KONTRAKTOR DI PROVINSI BANTEN DAN DKI JAKARTA
Abstract Docx -
Vol 3, No 1 (2014) - Articles
ANALISIS KINERJA SUPPLY CHAIN PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG
Abstract Docx -
Vol 3, No 1 (2014) - Articles
OPTIMALISASI WAKTU DAN BIAYA DENGAN PROJECT CRASHING DAN TAHAPAN DETERMINISTIK LEAST COST SCHEDULING
Abstract Docx -
Vol 3, No 1 (2014) - Articles
ANALISIS WAKTU DAN BIAYA MENGGUNAKAN METODE EARNED VALUE DAN OPTIMASI MENGGUNAKAN METODE CPM
Abstract Docx -
Vol 2, No 2 (2013) - Articles
STUDI PENGARUH KETERLAMBATAN PROYEK TERHADAP COST OVERRUNS PROYEK
Abstract PDF -
Vol 2, No 1 (2013) - Articles
PERENCANAAN TEBAL LAPIS PERKERASAN KAKU DENGAN MENGGUNAKAN METODE BINA MARGA 2003 DAN METODE BEAM ON ELASTIC FOUNDATION
Abstract PDF -
Vol 1, No 1 (2012) - Articles
ANALISIS PRODUKTIVITAS ALAT-ALAT BERAT STUDI KASUS PROYEK PEMBANGUNAN JALAN ANTARTIKA II DI KAWASAN INDUSTRI KRAKATAU STEEL, CILEGON
Abstract PDF -
Vol 1, No 1 (2012) - Articles
ANALISIS EFEK JENTRIFIKASI PADA FASAD DI KAWASAN KEMANG JAKARTA SELATAN SEBAGAI KAJIAN PENGEMBANG PERKOTAAN
Abstract PDF -
Vol 6, No 1 (2017) - Articles
STUDI LINGKUNGAN KERJA DAN KESEHATAN KESELAMATAN KERJA TERHADAP KINERJA PERUSAHAAN KONSTRUKSI DALAM LINGKUP DINAS CIPTA KARYA, BINA MARGA, DAN SUMBERDAYA AIR PROVINSI BANTEN
Abstract PDF -
Vol 6, No 1 (2017) - Articles
ANALISIS SISTEM DINAMIK KETERSEDIAAN BAJA TULANGAN SEBAGAI INFRASTRUKTUR (Studi Kasus: Kota Cilegon )
Abstract PDF -
Vol 6, No 2 (2017) - Articles
MANAJEMEN RISIKO PROYEK PEMBANGUNAN JALUR KERETAAPI YANG BERPENGARUH TERHADAP KINERJA WAKTU (Studi Kasus Double-Double Track Railway Jakarta, Zona Jatinegara-Bekasi)
Abstract PDF -
Vol 6, No 2 (2017) - Articles
Pengembangan dan Uji Model Sumber Daya Proyek Kontruksi Terhadap K3 (Kesehatan dan Keselamatan Kerja) dan Kinerja Perusahaan (Studi Kasus : Proyek Pembangunan Kontruksi Offshore Provinsi Banten)
Abstract PDF -
Vol 7, No 1 (2018) - Articles
ANALISIS KINERJA RANTAI PASOK MATERIAL ASPAL SEBAGAI BAHAN BAKU INFRASTRUKTUR JALAN DENGAN PENDEKATAN SISTEM DINAMIK (Studi Kasus : Provinsi Banten)
Abstract PDF -
Vol 8, No 2 (2019) - Articles
Pengaruh Strategi Dan Praktik Supply Chain Management Terhadap Kinerja Operasional Perusahaan (Studi Kasus : Beton Precast dan Readymix di Daerah Banten)
Abstract PDF
FONDASI : JURNAL TEKNIK SIPIL HAS BEEN INDEXED BY
Fondasi: Jurnal Teknik Sipil by Jurusan Teknik Sipil UNTIRTA is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Based on work at http://jurnal.untirta.ac.id/index.php/jft