Pemodelan Pemulihan Sistem 500 Kv Saat Terjadi Blackout Dengan Simulasi Digsilent

Samsurizal Samsurizal, Andi Makkulau

Abstract


The electric power system network must be maintained in its operation. The stability of the frequency in the balance between the power supply and the load is the main thing. In the event of a major disturbance, where many generating units are out of operation so that the system's generation capability is much lower than the load requirement, it can cause blackouts in the system. If this happens, the power system must immediately restore its generating capacity so that it can immediately serve the load or electricity users. In the simulation using DIgSILENT, it was found that the amount of load that must be sent by the Saguling PLTA to the Suralaya PLTU for the start-up process is 52.22 MW. And after the Suralaya PLTU is ready to operate, a recovery process is carried out on the 500 kV network by restoring GITET on the western system by paying attention to the frequency so that it returns to normal frequency. By using the software DIgSILENT 15.1.7. From the simulation results, the results showed that the Suralaya GITET recovered at a frequency of 50.072 Hz, 49.825 Hz at the Cilegon Baru GITET, 49.825 Hz at the Cibinong GITET, 49.953 Hz at the Bekasi GITET, and 50.064 Hz GITET in Cawang. While GITET Gandul at 49.866 Hz and GITET Kembangan at 50.078.


Keywords


Digsilent, Blackout, Load Recovery, Simulation

Full Text:

PDF (Indonesian)

References


Marsudi, D. (2005). Pembangkitan Energi Listrik. Jakarta: Penerbit Erlangga.

Pedoman Pemulihan Sistem Tenaga Listrik Jawa-Bali . (2007). Depok: PT PLN (Persero) P3B Jawa-Bali Bidang Operasi Sistem.

Despa, D. (2010). Analisis Kontingensi Terhadap Probabilitas Blackout PadaJaringan Sistem Tenaga Menggunakan Model Bertingkat. Rekayasa danTeknologi Elektro.

Evaluasi Operasi Sistem Tenaga Listrik Jawa-Bali. (2015). Jakarta: PT PLN(Persero) P2B Jawa Bali Bidang Operasi Sistem.

Shahidehpour, M., & Eremia, M. (2013). Handbook of Electrical Power System Dynamics. Piscataway: IEEE Pres Editorial Board

Fitrianto, A. (2005). Evaluasi Blackstart PLTU Suralaya. Jakarta: UniversitasIndonesia.

Kadir, A. (2006). Distribusi dan utilitas tenaga listrik. Jakarta: UniversitasIndonesia.

Kenedi, M. (2011). Proses Mengatasi Blackout Dalam Sistem Interkoneksi. Jakarta: Sekolah Tinggi Teknik PLN.

Khairiah, I. (2019). Kajian Kehandalan Sistem Blackstart Pada Pembangkit Listrik Tenaga Gas Uap Blok 1 Muara Karang. Jakarta: Sekolah Tinggi Teknik PLN.

M. M. Adibi, C. (1994). Expert System Requirement For Power System

Restoration (Vol. 9). Piscataway: IEEE Transactions on Power System.

Marsudi, D. (1990). Operasi Sistem Tenaga Listrik. Jakarta: Balai Penerbit & Humas ISTN.

Rencana Operasi Tahunan Sistem Jawa Bali. (2020). Jakarta: PT PLN (Persero) P2B Jawa Bali Bidang Perencanaan Sistem.

Rencana Penyediaan Tenaga Listrik Sistem Jawa Bali Periode 2016-2020. (2016). Jakarta: PT. PLN (Persero) Pusat Pengatur Beban.

Rencana Usaha Penyediaan Tenaga Listrik 2019-2028. (2019). Jakarta: PT. PLN (Persero).

Stevenson, W. (1984). Analisa Sistem Tenaga Listrik (Edisi Keempat). Jakarta: Erlangga




DOI: http://dx.doi.org/10.36055/setrum.v10i2.12033

Refbacks

  • There are currently no refbacks.