Penentuan target produksi paint roller berdasarkan perhitungan waktu baku menggunakan metode stopwatch time study
Abstract
Keywords
Full Text:
PDFReferences
O. Sutaarga and A. Setiawan, “Penentuan waktu baku dalam pengecekan bonding sampel sepatu pada PT. Ching Luh Indonesia,” Journal Industrial Manufacturing, vol. 6, no. 1, pp. 18–26, Feb. 2021, doi: 10.31000/jim.v6i1.4115.
A. Y. Pradana and F. Pulansari, “Analisis pengukuran waktu kerja dengan stopwatch time study untuk meningkatkan target produksi di PT. XYZ,” JUMINTEN, vol. 2, no. 1, pp. 13–24, Jan. 2021, doi: 10.33005/juminten.v2i1.217.
N. Kartika, S. M. Robial, and A. Pratama, “Analisis produktivitas tenaga kerja pada pekerjaan kolom di proyek pembangunan gedung Pemda Kabupaten Sukabumi,” Jurnal Momen Teknik Sipil, vol. 3, no. 2, pp. 103–112, 2021, doi: 10.35194/momen.v3i2.1207.
D. Septiyana, “Evaluasi pengukuran waktu kerja dengan metode time motion study pada Divisi Final Inspection PT. Gajah Tunggal Tbk,” Jurnal Teknik, vol. 8, no. 1, 2019, doi: 10.31000/jt.v8i1.1592.
X. Luo, H. Li, D. Cao, Y. Yu, X. Yang, and T. Huang, “Towards efficient and objective work sampling: Recognizing workers’ activities in site surveillance videos with two-stream convolutional networks,” Automation in Construction, vol. 94, pp. 360–370, Oct. 2018, doi: 10.1016/j.autcon.2018.07.011.
J. M. van de Pol, J. G. Geljon, S. V. Belitser, G. W. J. Frederix, A. M. Hövels, and M. L. Bouvy, “Pharmacy in transition: A work sampling study of community pharmacists using smartphone technology,” Research in Social and Administrative Pharmacy, vol. 15, no. 1, pp. 70–76, Jan. 2019, doi: 10.1016/j.sapharm.2018.03.004.
J. van de Pol, E. Koster, A. Hövels, and M. Bouvy, “Balancing traditional activities and cognitive pharmaceutical services by community pharmacists: a work sampling study,” International Journal of Clinical Pharmacy, vol. 41, no. 4, pp. 872–879, Aug. 2019, doi: 10.1007/s11096-019-00852-0.
M. Baláš, J. Gallo, and I. Kuneš, “Work sampling and work process optimization in sonic and electrical resistance tree tomography,” Journal of Forest Science, vol. 66, no. 1, pp. 9–21, Jan. 2020, doi: 10.17221/66/2019-JFS.
K. Y. Ferreira García, J. de la Riva Rodriguez, J. Sánchez Leal, R. M. Reyes-Martínez, and A. W. Prieto, “Determination of allowance time by work sampling and heart rate in manufacturing plant in Juárez México,” Journal of Engineering, vol. 2019, p. e1316734, Mar. 2019, doi: 10.1155/2019/1316734.
U. Bititci, P. Garengo, V. Dörfler, and S. Nudurupati, “Performance measurement: Challenges for tomorrow*,” International Journal of Management Reviews, vol. 14, no. 3, pp. 305–327, 2012, doi: 10.1111/j.1468-2370.2011.00318.x.
R. Jain, S. Gupta, M. l. Meena, and G. s. Dangayach, “Optimisation of labour productivity using work measurement techniques,” International Journal of Productivity and Quality Management, vol. 19, no. 4, pp. 485–510, Jan. 2016, doi: 10.1504/IJPQM.2016.080154.
C. Duran, A. Cetindere, and Y. E. Aksu, “Productivity improvement by work and time study technique for earth energy-glass manufacturing company,” Procedia Economics and Finance, vol. 26, pp. 109–113, Jan. 2015, doi: 10.1016/S2212-5671(15)00887-4.
A. u. Rehman, M. B. Ramzan, M. Shafiq, A. Rasheed, M. S. Naeem, and M. M. Savino, “Productivity improvement through time study approach: A case study from an apparel manufacturing industry of Pakistan,” Procedia Manufacturing, vol. 39, pp. 1447–1454, Jan. 2019, doi: 10.1016/j.promfg.2020.01.306.
N. Saibani, A. A. Muhamed, M. F. Maliami, and R. Ahmad, “Time and motion studies of manual harvesting methods for oil palm fruit bunches: A Malaysian case study,” Jurnal Teknologi, vol. 74, no. 3, May 2015, doi: 10.11113/jt.v74.4555.
C. Sinsky et al., “Allocation of physician time in ambulatory practice: A time and motion study in 4 Specialties,” Annals of Internal Medicine, vol. 165, no. 11, pp. 753–760, Dec. 2016, doi: 10.7326/M16-0961.
E. Houshyar and I.-J. Kim, “Understanding musculoskeletal disorders among Iranian apple harvesting laborers: Ergonomic and stop watch time studies,” International Journal of Industrial Ergonomics, vol. 67, pp. 32–40, Sep. 2018, doi: 10.1016/j.ergon.2018.04.007.
A. P. Puvanasvaran, C. Z. Mei, and V. A. Alagendran, “Overall Equipment Efficiency Improvement Using Time Study in an Aerospace Industry,” Procedia Engineering, vol. 68, pp. 271–277, Jan. 2013, doi: 10.1016/j.proeng.2013.12.179.
S. Nallusamy and S. Muthamizhmaran, “Enhancement of productivity and overall equipment efficiency using time and motion study technique - A review,” Advanced Engineering Forum, vol. 14, pp. 59–66, 2016, doi: 10.4028/www.scientific.net/AEF.14.59.
M. Faccio, E. Ferrari, M. Gamberi, and F. Pilati, “Human Factor Analyser for work measurement of manual manufacturing and assembly processes,” The International Journal of Advanced Manufacturing Technology, vol. 103, no. 1, pp. 861–877, Jul. 2019, doi: 10.1007/s00170-019-03570-z.
I. Imron, “Analisa Pengaruh Kualitas Produk Terhadap Kepuasan Konsumen Menggunakan Metode Kuantitatif Pada CV. Meubele Berkah Tangerang,” Indonesian Journal on Software Engineering (IJSE), vol. 5, no. 1, pp. 19–28, Jun. 2019, doi: 10.31294/ijse.v5i1.5861.
A. S. Mariawati, “Pengukuran Waktu Baku Pelayanan Obat Bebas Pada Pekerjaan Kefarmasian Di Apotek CT,” J. Ind. Serv., vol. 5, no. 1, pp. 1–3, 2019, doi: 10.36055/jiss.v5i1.6491.
M. Zulkifli, “Analisis Data Kuantitatif “Efekitivitas Metode Graphomotor Terhadap Kemampuan Menulis Peserta Didik”,” Al-Mujahidah, vol. 1, no. 2, pp. 104–117, Oct. 2020, doi: 10.51806/al-mujahidah.v1i2.15.
M. Priyo and M. R. A. Paridi, “Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi Pembangunan Gedung Olah Raga (Gor),” Semesta Teknika, vol. 21, no. 1, pp. 72–84, May 2018, doi: 10.18196/st.211213.
E. Nugraha and R. M. Sari, “Penentuan Waktu Proses Pembuatan Kain dengan Pendekatan Cross-Case pada Industri Tekstil,” Organum: Jurnal Saintifik Manajemen dan Akuntansi, vol. 1, no. 1, pp. 27–31, Jun. 2018, doi: 10.35138/organum.v1i1.28.
A. Sutiko, H. Suprapto, and D. Zainuddin, “Analisis Produktivitas dan Beban Kerja Operator Produksi dengan Metode Work Sampling dan NASA-TLX di PT. Tokai Dharma Indonesia Plant II,” Jurnal Optimasi Teknik Industri (JOTI), vol. 3, no. 2, pp. 49–55, Sep. 2021, doi: 10.30998/joti.v3i2.10026.
S. S. Zulaeha, “Pengukuran Waktu Kerja Baku Pada Proses Pembuatan Roti Fiphal,” Jurnal Agroindustri Halal, vol. 2, no. 1, pp. 24–30, 2016, doi: 10.30997/jah.v2i1.170.
Y. D. R. Montororing, “Usulan Penentuan Waktu Baku Proses Racking Produk Amplimesh Dengan Metode Jam Henti Pada Departemen Powder Coating,” J. Tek., vol. 7, no. 2, pp. 53–63, 2018, doi: 10.31000/jt.v7i2.1357.
E. Sitorus and N. Alfath, “Optimasi Jumlah Tenaga Kerja Berdasarkan Waktu Standard,” J. Sist. Tek. Ind., vol. 19, no. 2, pp. 10–14, 2017, doi: 10.32734/jsti.v19i2.368.
H. Ponda, J. Hardono, and S. K. Pikri, “Analisa keseimbangan lintasan produksi pada pembuatan radiator Mitsubishi PS 220 dengan metode ranked positional weight (RPW),” Journal Industrial Manufacturing, vol. 4, no. 1, pp. 77–92, Jan. 2019, doi: 10.31000/jim.v4i1.1251.
H. C. Suroso and Yulvito, “Analisa Pengukuruan Waktu Kerja guna Menentukan Jumlah Karyawan Packer di PT. Sinarmas Tbk,” J. IPTEK, vol. 24, no. 1, pp. 67–74, 2020, doi: 10.31284/j.iptek.2020.v24i1.906.
DOI: http://dx.doi.org/10.36055/jiss.v7i2.12756
Refbacks
- There are currently no refbacks.
is supported by