Risk management analysis in electrochlorination plant using House of Risk

Shanti Kirana Anggraeni, Nuraida Wahyuni, Desi Ramdhani

Abstract


XYZ Corp. is a petrochemical company with several Electrochlorination Plants (ECP) to produce chlorine. ECP is a room with a high risk because there can be a buildup of hydrogen gas in the ECP room, which can cause an explosion. Therefore, it is necessary to carry out risk analysis in activities at ECP to mitigate possible risks or disturbances. The purpose of this study is to identify risks and risk agents as well as risk agents that are prioritized in the Electrochlorination Plant (ECP), using the House of Risk (HOR) method, which consists of 2 phases. The first phase is identifying risk events and agents, which are then measured on the severity and occurrence levels and calculating the Aggregate Risk Priority (ARP) value. This study found that 17 risk events and 11 selected risk agents must be prioritized to be resolved. They contribute to an 80% cumulative value of the highest Aggregate Risk Potential (ARP), which means it has the most significant influence on daily operations. Therefore, the company must overcome this by taking preventive steps to minimize or eliminate the source of the risk.


Keywords


Electrochlorination; House of Risk; Risk event; Risk agent

Full Text:

PDF (EN)

References


S. A. Widyanto and A. Suprihanto, "Identifikasi Zona bahaya kebakaran pada unit Electrochlorination Plant (ECP) PLTU Rembang," Eksergi, vol. 13, no. 1, pp. 19-24, 2017.

Q. Sholihah, “Implementasi Sistem Manajemen K3 pada konstruksi jalan sebagai upaya pencegahan kecelakaan kerja,” Buletin Profesi Insinyur, vol. 1, no. 1, pp. 25–31, Apr. 2018, doi: 10.20527/bpi.v1i1.6.

D. S. Putro, “Strategi perbaikan implementasi Manajemen Keselamatan dan Kesehatan Kerja (K3) TPAS Wisata Edukasi Talangagung Kabupaten Malang,” Jurnal Serambi Engineering, vol. 6, no. 3, Jun. 2021, doi: 10.32672/jse.v6i3.3050.

M. E. Sibuea and H. S. Saragi, “Analisis risiko keterlambatan material dan komponen pada proyek pembangunan kapal dengan metode House of Risk (HOR) Studi Kasus: Pembangunan Kapal Ro-Ro 300 GT Danau Toba,” Jurnal Sistem Teknik Industri, vol. 21, no. 2, Aug. 2019, doi: 10.32734/jsti.v21i2.1217.

T. Gulo, “Strategi penanganan risiko terjadinya kecelakaan kerja di PT. Ikad dengan Metode Hor (House Of Risk),” Jurnal Syntax Transformation, vol. 1, no. 10, pp. 759–765, Dec. 2020, doi: 10.46799/jst.v1i10.182.

A. Andriyanto and N. K. Mustamin, “Analisis manajemen risiko dan strategi penanganan risiko pada PT Agility International menggunakan metode House Of Risk (HOR),” Jurnal Logistik Bisnis, vol. 10, no. 02, pp. 4–11, Nov. 2020, doi: 10.46369/logistik.v10i02.949.

E. W. Abryandoko and M. Mushthofa, “Strategi mitigasi resiko supply chain dengan metode House of Risk,” Rekayasa Sipil, vol. 14, no. 1, pp. 26–34, Feb. 2020, doi: 10.21776/ub.rekayasasipil.2020.014.01.4.

A. F. Priyono and F. Harianto, “Analisis penerapan Sistem Manajemen K3 dan kelengkapan fasilitas K3 pada proyek konstruksi gedung di Surabaya,” Rekayasa: Jurnal Teknik Sipil, vol. 4, no. 2, p. 11, Feb. 2020, doi: 10.53712/rjrs.v4i2.783.

N. D. Priyohadi and A. Achmadiansyah, “Hubungan faktor manajemen K3 dengan tindakan tidak aman (unsafe action) pada pekerja PT Pelabuhan Penajam Banua Taka,” Jurnal Baruna Horizon, vol. 4, no. 1, pp. 1–14, Jun. 2021, doi: 10.52310/jbhorizon.v4i1.51.

I. N. Putri, “Analisis risiko kegagalan produk mempengaruhi kualitas pelayanan menggunakan House Of Risk dan Supply Chain Operations Reference,” Jurnal Optimasi Teknik Industri (JOTI), vol. 2, no. 1, p. 19, Mar. 2020, doi: 10.30998/joti.v2i1.4049.

H. Pertiwi, “Implementasi manajemen risiko berdasarkan PMBOK untuk mencegah keterlambatan proyek area Jawa Timur (Studi Kasus: PT. Telkom),” Jurnal Studi Manajemen dan Bisnis, vol. 4, no. 2, pp. 96–108, Dec. 2017, doi: 10.21107/jsmb.v4i2.3959.

D. Retnowati, “Analisa risiko K3 dengan pendekatan Hazard and Operability Study (HAZOP),” Teknika: Engineering and Sains Journal, vol. 1, no. 1, p. 41, Jun. 2017, doi: 10.51804/tesj.v1i1.67.41-46.

A. Setiawan, M. Ayuwardani, B. Y. Wibowo, and I. Malebra, “Pelatihan manajemen k3 dan penerapannya sebagai ‘value co-creation’ di masa pandemik Covid-19 (Studi kasus pada pangkas rambut Madura di Kota Semarang),” Sasambo: Jurnal Abdimas (Journal of Community Service), vol. 4, no. 1, pp. 155–168, Feb. 2022, doi: 10.36312/sasambo.v4i1.605.

K. Korneilis and W. Gunawan, “Manfaat penerapansistem manajemen K3 dalam upaya pencapaian zero accident di suatu perusahaan,” Jurnal Sistem Informasi dan Informatika (Simika), vol. 1, no. 01, pp. 84–104, Sep. 2018, doi: 10.47080/simika.v1i01.41.

A. Badri, B. Boudreau-Trudel, and A. S. Souissi, “Occupational health and safety in the industry 4.0 era: A cause for major concern?,” Safety Science, vol. 109, pp. 403–411, Nov. 2018, doi: 10.1016/j.ssci.2018.06.012.

I. N. Pujawan and L. H. Geraldin, “House of risk: a model for proactive supply chain risk management,” Business Process Management Journal, vol. 15, no. 6, pp. 953–967, 2013, doi: 10.1108/14637150911003801.

E. J. Mrema, A. V. Ngowi, and S. H. D. Mamuya, “Status of Occupational Health and Safety and Related Challenges in Expanding Economy of Tanzania,” Annals of Global Health, vol. 81, no. 4, p. 538, Dec. 2015, doi: 10.1016/j.aogh.2015.08.021.

C. Varianou-Mikellidou et al., “Occupational health and safety management in the context of an ageing workforce,” Safety Science, vol. 116, pp. 231–244, Jul. 2019, doi: 10.1016/j.ssci.2019.03.009.

A. Bianchini, F. Donini, M. Pellegrini, and C. Saccani, “An innovative methodology for measuring the effective implementation of an Occupational Health and Safety Management System in the European Union,” Safety Science, vol. 92, pp. 26–33, Feb. 2017, doi: 10.1016/j.ssci.2016.09.012.

T. Aven, “Risk assessment and risk management: Review of recent advances on their foundation,” European Journal of Operational Research, vol. 253, no. 1, pp. 1–13, Aug. 2016, doi: 10.1016/j.ejor.2015.12.023.

E. Walujodjati and S. P. Rahadian, “Analisis Manajemen Risiko K3 Pekerjaan Jalan Tol Cisumdawu Phase III,” Jurnal Konstruksi, vol. 19, no. 1, pp. 60–69, Nov. 2021, doi: 10.33364/konstruksi/v.19-1.874.

S. Muflihah and H. S. Pudjihardjo, “Analisis manajemen risiko keselamatan dan kesehatan kerja (K3) pada proyek pembangunan gedung di Semarang,” Teknika, vol. 14, no. 2, p. 54, Oct. 2019, doi: 10.26623/teknika.v14i2.1805.

F. Tamim and A. Ismail, “Analisis manajemen risiko dan pengendalian Kesehatan dan Keselamatan Kerja (K3) pada pekerjaan power house,” Jurnal Konstruksi, vol. 18, no. 1, pp. 1–10, Aug. 2020, doi: 10.33364/konstruksi/v.18-1.772.

Yosritzal, B. M. Adji, and F. Rizola, “The analysis of supply chain risk logistics in implementation of West Sumatera - Riau toll road development,” IOP Conference Series: Earth and Environmental Science, vol. 340, p. 012044, Oct. 2019, doi: 10.1088/1755-1315/340/1/012044.

N. Zahroh, A. P. Wicaksono, and A. Deharja, “Analisis manajemen risiko kesehatan dan keselamatan kerja di bagian filing RSUP dr. Soeradji Tirtonegoro Klaten,” J-REMI : Jurnal Rekam Medik dan Informasi Kesehatan, vol. 1, no. 3, pp. 148–154, Aug. 2020, doi: 10.25047/j-remi.v1i3.1989.




DOI: http://dx.doi.org/10.36055/jiss.v8i2.17296

Refbacks

  • There are currently no refbacks.


  is supported by