Analysis of Time and Cost Control in a 2-Storey Construction Project Using the Earned Value Method (Case Study: Puri Cempaka Serang Housing Development Project)

Dwi Novi Setiawati, Bambang Setyo P, Inggit Kurniawan

Abstract


Poor planning is a common factor in project delays. For this reason, a time and cost analysis method is needed which can examine how much deviation occurs and the remaining time and costs to complete the project. The purpose of this research is to find out time and cost performance, what causes delays, and the estimated time and cost of project completion. For management activities costs (Cost Management) and time management (Time Management) can be This is done by using one of the project control methods, namely the value concept method results (Earned Value). The Earned Value (EV) method is one of the techniques for determining the real advantages and disadvantages of projects and provides a means to balance gains/losses and maximize profits. Week 1 to week 9 cost performance saves job fees. However, from the 14th to the 20th week of experiencing expenditure is greater than the project budget with a CPI value of 0,748 and performance The time from week 1 to week 9 is faster. But from week 13 to week, 20 time performance is slower with an SPI value of 0,59. The result of the calculation of the estimated cost of completing the project is Rp. 5.245.556.910 with an estimated turnaround time of 41 weeks, showing the project was 17 weeks late from the planned 24 weeks. Causative factor delays are work drawings or shop drawings that are late coming out as well as their gradual submission, lack of fill land, and workers getting a portion of the Eid holiday of ± 1 month.

Keywords


Method Earned Value, Time and Cost Performance

Full Text:

PDF

References


A. Husen, Manajemen Proyek. 2010.

A. B. Siswanto and M. A. Salim, Manajemen Proyek. CV. Pilar Nusantara, 2019.

A. Husen, Manajemen Proyek (edisi revisi). 2011.

N. I. Hayati and D. Lugi, “EVALUASI BIAYA DAN WAKTU DENGAN METODE EARNED VALUE MANAGEMENT (Studi Kasus: Ruko Damara Village, Kel. Ciparigi, Kota Bogor),” J. Komposit, vol. 4, no. 2, p. 61, 2022, doi: 10.32832/komposit.v4i2.3760.

Nurhayati, Manajemen Proyek. Yogyakarta: Graha Ilmu, 2020.

F. Ramdhani, “Analisis Biaya dan Waktu dengan Metode Earned Value Concept pada Proyek

BJDM Area Rl Construction At Well 3S-21B Area 9 PT. Adhi Karya CS Work Unit Rate Packagea – Duri,” J. RACIC, vol. 1, no. 1, pp. 17–35, 2016.

R. Auzan, D. Rizky, and F. Kistiani, “Pengendalian Biaya Dan Waktu Proyek Dengan Metode

Konsep Nilai Hasil ( Earned Value ),” J. Tek., vol. 7, no. 4, pp. 671–675, 2015.

S. H. Kim, “Free-electron two-quantum stark radiation driven by the electric wiggler associated with density modulation in a hydrodynamic free-electron laser,” J. Korean Phys. Soc., vol. 60, no. 5, pp. 674–679, 2012.

E. Susanti and N. Runiawati, Manajemen Proyek. Tangerang Selatan, 2021.

C. A. P. Soares, “the Use of Earned Value Analysis ( Eva ) in the Cost Management of the Use of Earned Value Analysis ( Eva ) in the Cost,” no. August, 2017.

I. A. P. S. Mahapatni, Metode Perencanaan dan Pengendalian Proyek Konstruksi. 2019.

M. I. Maromi and R. Indryani, “Metode Earned Value untuk Analisa Kinerja Biaya dan Waktu

Pelaksanaan pada Proyek Pembangunan Condotel De Vasa Surabaya,” J. Tek. ITS, vol. 4, no. 1, pp. D54–D59, 2015.

H. A. Rani, “Manajemen Proyek Konstruksi,” 2016.

M. Pastiarsa, “Manajemen Proyek Konstruksi Bangunan Industri: Perspektif Pemilik Proyek,” Penerbit Teknosain, Yogjakarta, 2015.

D. Asmaroni and A. Setiawan, “Penggunaan Metode Nilai Hasil (Earned Value Analysis)

Terhadap Biaya Dan Waktu Pada Proyek Konstruksi Bangunan Perumahan (Studi Kasus Proyek

Konstruksi Bangunan Perumahan PT. Graha Praja Kencana Di Desa Ceguk Kecamatan Tlanakan

Kabupaten Pamekasan),” Ge-STRAM J. Perenc. dan Rekayasa Sipil, vol. 3, no. 1, pp. 31–39,

, doi: 10.25139/jprs.v3i1.2439.




DOI: http://dx.doi.org/10.36055/fondasi.v12i1.19559

Refbacks

  • There are currently no refbacks.


 

FONDASI : JURNAL TEKNIK SIPIL HAS BEEN INDEXED BY

 

 

  

 

  

 THE IDENTIFICATION OF ANTIBACTERIAL COMPOUNDS IN CLOVE STEM EXTRACT  (Syzygium aromaticum) AND ITS EFFECTIVENESS IN INHIBITING THE GROWTH OF  Escherichia coli | Safitri | JBIO: jurnal biosains (the journal of  biosciences)

 Lisensi Creative Commons

Fondasi: Jurnal Teknik Sipil by Jurusan Teknik Sipil UNTIRTA  is licensed under a  Creative Commons Attribution-ShareAlike 4.0 International License.    

 
Based on work at http://jurnal.untirta.ac.id/index.php/jft