Optimalisasi Sistem Pembebanan Unit-Unit Pembangkit Listrik dengan Menggunakan Metode Algoritma Genetik
Abstract
In this research will optimize the loading system of power plant units 1-4 of PLTU Suralaya using genetic algorithm method. Optimization (unit of commitment) is designed using matlab software with the right purpose and constraints. Unit Commitment is a problem in the work system that determines the timing of the plant to meet the electricity needs. The method used is a system that can produce optimal loading system with a minimum cost. The simulation was conducted on 1-4 units of Suralaya power plant with total load of 33,117 MW for 24 hours. Using genetic algorithm, the cost reduction process is 5.7105%.
Keywords
Full Text:
PDFReferences
A. Wood and B. Wollenberg, Power generation, operation, and control, second edition. New york: A Wiley-Interscience Publication, 1996.
A. Zulfatri, “Jurnal Momentum ISSN : 1693-752X Analisis Penjadwalan Unit-Unit Pembangkit Listrik Dengan Menggunakan Metode Unit Decommitment Jurnal Momentum ISSN : 1693-752X,” vol. 13, no. 2, pp. 115–120, 2012.
D. Marsudi, Operasi Sistem Tenaga Listrik, Kedua. Yogyakarta: Graha Ilmu, 2006.
J. Zhu, Optimization of Power System Operation. United States of America: A John Wiley & Sons, Inc., 2009.
D. Marsudi, Pembangkitan Energi Listrik. Jakarta: Penerbit Erlangga, 2005.
H. Saadat, Power System Alanysis. New York: The McGraw-Hill Companies, 1999.
A. Messac, Optimization in Practice with MATLAB®: For Engineering Students and Professionals. United States of America: Cambridge University Press, 2015.
DOI: http://dx.doi.org/10.36055/setrum.v7i2.5131