Usulan perawatan mesin presss h-draw pada divisi stamping press dengan metode reliability centered maintenance dan reliability centered spares (studi kasus: PT. TMMI)
Abstract
Keywords
Full Text:
PDFReferences
M. Ulfah, P. F. Ferdinant, N. Zahra, “Usulan perawatan equipment universal preparing stand menggunakan reliability block diagram di PT.X “, in Proocedings of Seminar Nasional Teknik Industri: Frontier in Industrial Engineering, Yogyakarta, Indonesia, October 17, 2018, M. K. Herliansyah, N. A. Masruroh, S. R. Sulistyo, T. Wijayanto, Eds. Yogyakarta: Department of Mechanical and Industrial Engineering, Universitas Gadjah Mada, 2018, pp. TP-144. [Online] https://senti.ft.ugm.ac.id/wp-content/uploads/sites/454/2018/10/Prosiding-SeNTI-2018.pdf.
C. Ebeling, An introduction to reliability and maintanability engineering. Dayton: University of Dayton.1997.
R. Pardiyono and T. Hartanto, “Usulan preventive maintenance komponen kritis pada mesin high preasure pump di PT. Dian Swasetika Sentosa dengan metode group replacement,” INFOMATEK: Jurnal Informatika, Manajemen dan Teknologi, vol. 21, no. 2, pp. 117–126, Nov. 2019, doi: 10.23969/infomatek.v21i2.1985.
A. Zakir, S. A. Dalimunthe, and D. Irwan, “Penerapan algoritma round robin pada penjadwalan preventive maintenance di PT. Pasifik Satelit Nusantara,” Jurnal Tekinkom (Teknik Informasi dan Komputer), vol. 3, no. 2, pp. 54–61, Jan. 2021, doi: 10.37600/tekinkom.v3i2.142.
A. Sukopriyatno, S. Rahayuningsih, and A. Komari, “Perancangan penjadwalan perawatan mesin bubut dengan metode reliability centered maintenance (RCM) di bengkel pemesinan SMK Negeri 1 Kediri,” JURMATIS: Jurnal Manajemen Teknologi dan Teknik Industri, vol. 1, no. 1, pp. 13–23, Mar. 2019, doi: 10.30737/jurmatis.v1i1.291.
I. Noor, “Perancangan preventive maintenance alat berat di PT. Kalimantan Prima Persada,” Journal of Industrial Engineering and Operation Management, vol. 3, no. 2, Dec. 2020, doi: 10.31602/jieom.v3i2.5357.
A. B. Sulistyo and S. H. Mutiawati, “Usulan jadwal preventive maintenance komponen ban pada truk tronton 20.000 kl menggunakan metode age replacement”, INTECH, vol. 7, no. 2, pp. 137-146, Dec. 2021, doi: 10.30656/intech.v7i2.3891.
Moubray, J, Reliability Centered Maintenance II (2nd Edition). Oxford: Butterworth-Heinermann, 1997
Z. Ega, J. Alhilman, and F. T. D. Atmaji, “Perencanaan pengelolaan suku cadang pada pompa produk menggunakan reliability centered spares pada terminal BBM PT. XYZ,” Journal Industrial Servicess, vol. 4, no. 1, Oct. 2018, doi: 10.36055/jiss.v4i1.4095.
T. Pardede, R. Saedudin, and S. Sutrisno, "Perencanaan kebijakan pengelolaan suku cadang corazza a452 dan corazza ff100 line 3 menggunakan metode reliability centered spares (Studi kasus : PT XYZ). Jurnal Rekayasa Sistem & Industri (JRSI), vol. 2, no. 4, pp. 82-88, 2015, doi:10.25124/jrsi.v2i04.56.
M. Awaludin, “Penerapan algoritma k-means clustering pada k-harmonic means untuk schedule preventive maintenance service,” JSI (Jurnal sistem Informasi) Universitas Suryadarma, vol. 6, no. 1, pp. 1–17, Jan. 2019, doi: 10.35968/jsi.v6i1.271.
D. S. Dhamayanti, J. Alhilman, and N. Athari, “Usulan preventive maintenance pada mesin komori ls440 dengan menggunakan metode reliability centered maintenance (RCM II) dan risk based maintenance (RBM) di PT ABC,” Jurnal Rekayasa Sistem & Industri (JRSI), vol. 3, no. 02, pp. 31–37, Apr. 2016, doi: 10.25124/jrsi.v3i02.29.
F. Sembiring, Yesi, and N. D. Ariani, “Implementasi penjadwalan preventive maintenance sistem informasi dengan metode RCM di PT. Pratama Abadi Industri (JX),” Jurnal Riset Sistem Informasi dan Teknologi Informasi (JURSISTEKNI), vol. 3, no. 1, pp. 25–35, Jan. 2021, doi: 10.52005/jursistekni.v3i1.68.
A. D. Susanto and H. H. Azwir, “Perencanaan perawatan pada unit kompresor tipe screw dengan metode RCM di industri otomotif,” Jurnal Ilmiah Teknik Industri, vol. 17, no. 1, pp. 21–35, Jul. 2018, doi: https://doi.org/10.23917/jiti.v17i1.5380.
I. P. Raharja, I. B. Suardika, and H. Galuh W., “Analisis sistem perawatan mesin bubut menggunakan metode RCM (reliability centered maintenance) di CV. Jaya Perkasa Teknik”, industri, vol. 11, no. 1, pp. 39-48, Apr. 2021, doi: 10.36040/industri.v11i1.3414.
A. Syahabuddin, “Analisis perawatan mesin bubut cy-l1640g dengan metode reliability centered maintenance (RCM) di PT. Polymindo Permata,” JITMI (Jurnal Ilmiah Teknik dan Manajemen Industri), vol. 2, no. 1, pp. 27–36, Aug. 2019, doi: 10.32493/jitmi.v2i1.y2019.p27-36.
DOI: http://dx.doi.org/10.36055/jiss.v7i1.12777
Refbacks
- There are currently no refbacks.
is supported by