Optimizing the placement and construction capacity of the Mantingan Substation using the imperialist competitive algorithm method

Jimmy Trio Putra, Nisaun Fadhilah, Dandy Abdul Rahman, Muhammad Arrofiq

Abstract


Judul: Optimasi penempatan dan kapasitas pembangunan Gardu Induk Mantingan dengan metode imperialist competitive algorithm

Title: Optimizing the placement and construction capacity of the Mantingan Substation using the imperialist competitive algorithm method

 

Optimasi penempatan dan kapasitas pembangunan gardu induk (GI) merupakan permasalahan yang penting dalam perencanaan sistem transmisi-distribusi. Pembangunan gardu induk baru direncanakan dalam menentukan kesiapan GI untuk melayani pertumbuhan beban di masa datang sehingga lokasi dan kapasitas yang optimal menjadi hal penting untuk dipertimbangkan. Metode metaheuristic-imperialist competitive algorithm (ICA) dalam penelitian ini digunakan dalam menentukan kapasitas dan lokasi perluasan GI secara optimal. Kekangan yang digunakan yaitu kondisi geografis dan tegangan penyulang sebesar 0,90 p.u. sampai dengan 1,05 p.u. Jenis perencanaan yang dilakukan adalah perencanaan satu tahap, dengan periode waktu  8 tahun (jangka panjang). Hasil penelitian mengusulkan tiga penyulang; Walikukun, Trinil dan Sine dipindahkan ke GI baru yakni di Mantingan. Dengan skenario tersebut, didapatkan bahwa kapasitas transformator pada GI Mantingan sebesar 60 MVA, lokasi pembangunan GI pada koordinat -7.4027, 111.1282 dan total biaya pembangunan GI sebesar 85,541 milyar rupiah.

 

Optimizing the substation (SS) placement and development capacity is an essential issue in planning the transmission distribution system. Furthermore, the construction of new substations is intended to determine the SS's readiness to serve the load growth in the future so that optimal location and capacity are essential things to consider. The metaheuristic-imperialist competitive algorithm (ICA) method is used in this study to determine the optimal capacity and location for SS expansion. The constraints used are geographical conditions and feeder stress of 0.90-1.05 p.u. The planning carried out is one-stage planning, with a period of 8 years (long term). The study results propose that three feeders, i.e., Walikukun, Trinil, and Sine, were transferred to a new SS in Mantingan. With this scenario, we get the transformer capacity of the Mantingan substation is 60 MVA. The substation construction location is at coordinates -7.4027, 111.1282, and the total construction cost of the substation is 85.541 billion rupiahs.


Keywords


Imperialist Competitive Algorithm; Transformer Capacity; Substation Expansion;

Full Text:

PDF (English)

References


Alizadeh, B., & Jadid, S. (2011). Reliability constrained coordination of generation and transmission expansion planning in power systems using mixed integer programming. IET generation, transmission & distribution, vol. 5, no. 9, pp. 948-960.

Hooshmand, R. A., Hemmati, R., & Parastegari, M. (2012). Combination of AC transmission expansion planning and reactive power planning in the restructured power system. Energy Conversion and Management, vol. 55, pp. 26-35.

Shayeghi, H., Mahdavi, M., & Bagheri, A. (2010). Discrete PSO algorithm based optimization of transmission lines loading in TNEP problem. Energy Conversion and management, vol. 51, no. 1, pp. 112-121.

Foroud, A. A., Abdoos, A. A., Keypour, R., & Amirahmadi, M. (2010). A multi-objective framework for dynamic transmission expansion planning in competitive electricity market. International Journal of Electrical Power & Energy Systems, vol. 32, no. 8, pp. 861-872.

Cadini, F., Zio, E., & Petrescu, C. A. (2010). Optimal expansion of an existing electrical power transmission network by multi-objective genetic algorithms. Reliability Engineering & System Safety, vol. 95, no. 3, pp. 173-181.

Akbari, T., Rahimikian, A., & Kazemi, A. (2011). A multi-stage stochastic transmission expansion planning method. Energy Conversion and Management, vol. 52, no. 8-9, pp. 2844-2853.

Kristiansen, T., & Rosellon, J. (2010). Merchant electricity transmission expansion: A European case study. Energy, vol. 35, no. 10, pp. 4107-4115.

Rahmani, M., Rashidinejad, M., Carreno, E. M., & Romero, R. (2010). Efficient method for AC transmission network expansion planning. Electric Power Systems Research, vol. 80, no. 9, pp. 1056-1064.

Federal Energy Regulatory Commission (FERC). (2011). Midwest Independent Transmission System Operator (Midwest ISO). Washington: Federal Energy Regulatory Commission.

Willis, H. L. (2004). Power Distribution Planning Reference Book. New York: Marcel Dekker.

Gonzalez-Romero, I. C., Wogrin, S., & Gómez, T. (2020). Review on generation and transmission expansion co-planning models under a market environment. IET Generation, Transmission & Distribution, vol. 14, no. 6, pp. 931-944.

Baharvandi, A., Aghaei, J., Niknam, T., Shafie-Khah, M., Godina, R., & Catalao, J. P. (2018). Bundled generation and transmission planning under demand and wind generation uncertainty based on a combination of robust and stochastic optimization. IEEE Transactions on Sustainable Energy, vol. 9, no. 3, pp. 1477-1486.

Singh, R. P. (2011). Heritagescapes & Cultural Landscapes: An Appraisal. Planet Earth & Cultural Understanding Series. New Delhi: Shubhi Publications.

Sarjiya, S., & Pardede, B. (2017). Substation expansion planning in Kulon progo region using imperialist competitive algorithm. In 2017 9th International Conference on Information Technology and Electrical Engineering (ICITEE), pp. 1-5.

Talatahari, S., Azar, B. F., Sheikholeslami, R., & Gandomi, A. H. (2012). Imperialist competitive algorithm combined with chaos for global optimization. Communications in Nonlinear Science and Numerical Simulation, vol. 17, no. 3, pp. 1312-1319.

Hosseini, S., & Al Khaled, A. (2014). A survey on the imperialist competitive algorithm metaheuristic: implementation in engineering domain and directions for future research. Applied Soft Computing, vol. 24, pp. 1078-1094.

Ravadanegh, S. N., & Roshanagh, R. G. (2013). A heuristic algorithm for optimal multistage sizing, siting and timing of MV distribution substations. Electric power systems research, vol. 105, 134-141.

Ebrahimpourain, R., & Kazemi, M. (2014). Multi-Objective Placement of Multiple Distributed Energy Resources in Distribution System Using Imperialist Competitive Algorithm (ICA). International Journal on Technical and Physical Problems of Engineering (IJTPE), vol. 6, no. 18, pp. 89-95.




DOI: http://dx.doi.org/10.36055/tjst.v17i1.10764

Refbacks

  • There are currently no refbacks.


Copyright (c) 2021 Teknika: Jurnal Sains dan Teknologi

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

Creative Commons License

Teknika: Jurnal Sains dan Teknologi is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.