TURBINE PERFORMANCE ANALYSIS IN THE HIGH PRESSURE HEATER (HPH) CONDITION NOT OPERATING

Ni Ketut Caturwati, Yusvardi Yusuf, Imron Rosyadi

Abstract


Turbines are one important component in a power plant. The function of the turbine is to utilize the potential energy contained in the steam which is then converted into kinetic energy by the nozzle, then the kinetic energy is converted again into mechanical energy in the turbine blade and shaft rotation. In a rankine cycle after the steam comes out of the Low Pressure Turbine (LPT), the steam will change in phase from gas to liquid by passing through the condenser. The condensate water is heated again through a Low Pressure Heater (LPH) until finally it is heated again to the High Pressure Heater (HPH) before entering the boiler. But whether the performance of the turbine if when the HPH is not operating will decrease. In this study, an efficiency calculation will be carried out between the condition of the HPH operating and the condition of the HPH not operating, as well as finding coal consumption in both conditions. Based on the study, turbine efficiency did not show any significant difference between the condition of the HPH being in operation and the HPH not operating, that is 94.07% for the condition of the HPH to operate and 93.72% for the condition of the HPH not operating. While coal consumption at the time the HPH was operating was 164 Ton / h and at the HPH not operating was 170 Ton /h.


Full Text:

PDF

References


Ketel Uap, Djokosetyardjo,MJ, PT Pradnya Paramita, Jakarta, 2003

Muin, Syamsir A. (1988) Pesawat-Pesawat Konversi Energi, edisi pertama, Rajawali, Jakarta

Fundamental of Engineering Thermodinamics, Moran ,M.j, John Willey, & Sons. Inc, New York, 1999

The Babcock & Wilcox Company, 1978, Steam It’s Generation and Use, 40th edition, The Babcock & Wilcox Company, New York

Diklat Profesi Pembangkitan, 2009, Pengoperasian Boiler, PT.PLN (Persero) Pusat Pendidikan Dan Pelatihan, Jakarta

Diklat Profesi Pembangkitan, 2009, Pengoperasian PLTU, PT.PLN (Persero) Pusat Pendidikan Dan Pelatihan, Jakarta

UNEP, “ Boiler dan Pemanas Fluida Thermis” United Nation Environment Program, 2008

Halim Rusjdi dkk (2016), Analisis Perpindahan Kalor High Pressure Heater PLTU Banten 3 Lontar Unit 1, Jurnal Power Plant Vol.4 No.3

Jamaludin dan Iwan Kurniawan, Analisis Perhitungan Daya Turbin yang dihasilkan dan Efisiensi Turbin Uap pada Unit 1 dan Unit 2 di PT. Indonesia Power UBOH UJP Banten 3 Lontar

Akbar Kurnia dan Prabowo (2015), Simulasi Gatecycle Pengaruh Off Service High Pressure Heater Terhadap Performa Pembangkit Listrik Tenaga Uap 200 MW PT. PJB Gresik, Jurnal Teknik ITS Vol.4 No.1