Performance Testing and Preventive Maintenance of Roller Bending Machine Using the ISMO Method

Adhan Efendi, Yohanes Sinung Nugroho

Abstract


This study aimed to perform performance testing and make a preventive maintenance plan on the roller bending machine with inspection, small-repair, medium repair, and overhaul (ISMO) methods. The preventive maintenance time of the roller bending machine run with daily and monthly types of maintenance. The results showed that the performance and calculations to determine the radius of the rolling results with the digital calculation method through the machine test application worked optimally. Monthly and daily routine preventive maintenance was accomplished using the ISMO method. The total time required for the roller bending machine prevention machine maintenance is 800 minutes per month. The breakdown includes 180 minutes for inspection, 80 minutes for minor repair, and 540 minutes for moderate repair.


Keywords


performance testing, preventive maintenance, roller bending machine, ISMO method

Full Text:

PDF

References


References

Patrick E.A and Joseph. K.A, “Design and Fabrication of a Three – Rolls Plate Bending Machine,” Journal Innovantive Systems Design and Engineering, Vol. 10, No.6, 2019.

Tawanda M, “Design of an Electrically Powered Bending Machine: Case of Zimbabwe,” Proceedings of the International Conference on Industrial Engineering and Operations Management, April. 2017.

Nilesh W.N and A.K. Mahalle, “Design and Analysis of Portable Rolling and Bending Machine Using CAD and FEA Machine,” International Journal of Engineering Research and Technology (IJERT). Vol. 2, No. 4, April. 2013.

Anand J.A, Krishna Kumar E, Krishnamoorthy M, Harisbakar S, and Kapilan R, “Design and Fabrication of Rolling, Bending and Riveting Machine,” International Research Journal of Engineering and Technology (IRJET), Vol 05, No.04, April. 2018.

Anand J.A, Pravinkumar K, Pradadeeshwaran S, Pratheeswaran S, Nandakumar T, “Design and Fabrication of Roll Bending Machine,” Research Journal of Engineering and Technology (IRJET), Vol 05, No.04, April. 2018.

Rohan P, Aravind P, Naveen N, Nagalingappa A, Pawan B, and Shivaprakash M.V, “Design and Fabrications of Manual Roller Bending Machine,” Research Journal of Engineering and Technology (IRJET), Vol 06, No.07, April. 2019.

Pedro B. F.F, “Roll Forming – a Study on Machine Deflection by Means of Experimental Analysis and Numerical Development,” Thesis Faculdade De Engenharia Universidade Do Porto, March. 2016.

Shete Y. S. “Design of Motorized Roll Bending Machine: Concept,” International Journal for Scientifix Research and Development, Vol. 9, No. 2, 2020.

Ionel G, Doina B, and Felicia S. “Estimating of Bending Force and Curvature of the Bending Plate in a Three-Roller bending System Using Finie Element Simulation and Analytical Modeling,” Journal Materials, Vol 14, 1204, 2021.

Orazio, M. D, “Roll Bending Machine,” United States Patent. Patent US 005218850A, Juny 15, 1993.

Ramandi R, Caporusso M, Caporusso A, Ramandi S, “Modular Multipurpose Bending Machine and Its Linear Positioning System. European Patent. Patent EP 0 879 655 A2. May, 15, 1998.

Sathish K.N and Yogish, “Preventive Maintenance and Breakdown Reduction of Critical Machines,” Research Journal of Engineering and Technology (IRJET), Vol 03, No.06, June. 2016.

U.S. Departement of the Intertior Bureau of Reclamation Denver, “Maintenance Scheduling for Machine Equipment,” Departement of the Intertior Bureau of Reclamation Denver. United States, 2009.

F. Chalvin, Y. Miyamae, Y. Oku, and K. Nakahara, “ Predictive Maintenance Using Recurrent Neural Network Without Feature Engineering,” Proceeding Lecture Notes in Mechanical Engineering, Springer, pp 103-116. 2021.

Zimin M.Y, Dragan D, and Jun N, “ Maintenance Scheduling in Manufacturing Systems Based on Predicted Machine Degraation,” Journal Intell Manufacturing, No 19, pp 87-98. 2008.

Albarade L, Eric P, Vijayakumar C. V. and Brian D.C, “ Methods and Apparatus For Predictictive Preventive Maintenance of Processing Chambers,” United States Patent. Patent US 8473089 B2, Juny, 25, 2013.

M.C. Eti, S.O.T. Ogaji and S.D. Probert, “ Development and Impelemntation Preventive-Maintenance Practices in Nigerian Industry,” Journal Applied Energy, Vol. 18, No. 1, pp 1163-1179, 2006.

Hartomo S and Siska A.W, “ Analysis of Maintenance Processes by using FMEA Method in Sugar Industri,” IOP Conf. Series: materials Science and Engineering 528, 2019.

A. Efendi, Rosiah, and Ade N, “ Performance Testing and Preventive Maintenance of Automatic Handwashing Machine in the Efforts of Covid-19 Prevention ,” Proceeding Lecture Notes in Mechanical Engineering, Springer, pp 139-144. 2021.

R. Briš, R. Goňo & S. Rusek, “ Maintenance Analysis and Optimization of a Distribution Network From Practice,” Safety, Reliability, and Risk Analysis: Beyond the Horizon, 2014.




DOI: http://dx.doi.org/10.30870/vanos.v7i1.14277

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License