Workload Analysis in Determining The Number of Workers Handling Delivery of Brake Master Cylinder Products at Company X
Abstract
Company X is an automotive company engaged in manufacturing, one of the suppliers of automotive components in the form of brake master cylinders to various largest automotive companies in Indonesia. To increase the company's competitiveness and development, company X pays special attention to increasing productivity and efficiency. In company X, there is a section for shipping finished goods/products called the handling delivery section. Of Company In this research, a time study was carried out using the stopwatch time study method to obtain standard time, workload, and number of workers to complete the delivery handling process. Delivery handling process activities are grouped based on the two Material Handling Equipment (PMH) used, namely PMH hand pallet and PMH forklift. The PMH hand pallet activity has four work floors, ten activity elements, and five workers. The PMH Forklift activity, has two work floors, four activity elements, and two workers. From data for the 2023 period, in 245 working days, were 1,872,844 products sent to customers. From the analysis results, it was found that the average working time for PMH hand pallet activities was 327.92 seconds, and PMH forklift was 167.623 seconds. Then, based on working time/worker/day of 420 minutes or 25,200 seconds, with 438 product deliveries per day, the workload of five workers experienced an excess of PMH hand pallet 113.991% and PMH forklift 145.67%. With the addition of one worker for PMH hand pallet, and one worker for PMH forklift, the workload is not excessive, namely 94.99% for PMH hand pallet and 97.10% for PMH forklift.
Company X is an automotive company engaged in manufacturing, one of the suppliers of automotive components in the form of brake master cylinders to various largest automotive companies in Indonesia. To increase the company's competitiveness and development, company X pays special attention to increasing productivity and efficiency. In company X, there is a section for shipping finished goods/products called the handling delivery section. Of Company In this research, a time study was carried out using the stopwatch time study method to obtain standard time, workload, and number of workers to complete the delivery handling process. Delivery handling process activities are grouped based on the two Material Handling Equipment (PMH) used, namely PMH hand pallet and PMH forklift. The PMH hand pallet activity has four work floors, ten activity elements, and five workers. The PMH Forklift activity, has two work floors, four activity elements, and two workers. From data for the 2023 period, in 245 working days, were 1,872,844 products sent to customers. From the analysis results, it was found that the average working time for PMH hand pallet activities was 327.92 seconds, and PMH forklift was 167.623 seconds. Then, based on working time/worker/day of 420 minutes or 25,200 seconds, with 438 product deliveries per day, the workload of five workers experienced an excess of PMH hand pallet 113.991% and PMH forklift 145.67%. With the addition of one worker for PMH hand pallet, and one worker for PMH forklift, the workload is not excessive, namely 94.99% for PMH hand pallet and 97.10% for PMH forklift.
Keywords
References
P. Pengolahan Sampah Botol Plastik Guna Meningkatkan Produktivitas Kerja Dan Menurunkan Penumpukan Sampah Botol Plastik, “Analisis Pengukuran Waktu Kerja (Time Study) Pada”.
R. P. Lukodono and S. K. Ulfa, “DETERMINATION OF STANDARD TIME IN PACKAGING PROCESSING USING STOPWATCH TIME STUDY TO FIND OUTPUT STANDARD,” JEMIS (Journal of Engineering & Management in Industrial System), vol. 5, no. 2, pp. 87–94, Mar. 2018, doi: 10.21776/UB.JEMIS.2017.005.02.5.
E. Mahawati et al., “Analisis Beban Kerja dan Produktivitas Kerja,” Yayasan Kita Menulis, p. 188, Jan. 2021, Accessed: Aug. 22, 2024. [Online]. Available: https://repository.unai.edu/id/eprint/285/1/2021-2022 Ganjil Analisis Beban Kerja Full_compressed.pdf
A. Irawan and E. B. Leksono, “Analisis Beban Kerja pada Departemen Quality Control,” Jurnal INTECH Teknik Industri Universitas Serang Raya, vol. 7, no. 1, pp. 1–6, Jan. 2021, doi: 10.30656/INTECH.V7I1.2537.
N. V. Febriana et al., “ANALISIS PENGUKURAN WAKTU KERJA DENGAN METODE PENGUKURAN KERJA SECARA TIDAK LANGSUNG PADA BAGIAN PENGEMASAN DI PT JAPFA COMFEED INDONESIA TBK,” Industria: Jurnal Teknologi dan Manajemen Agroindustri, vol. 4, no. 1, pp. 66–73, 2015, Accessed: Aug. 22, 2024. [Online]. Available: https://industria.ub.ac.id/index.php/industri/article/view/176
E. Satriyanto and W. Yuwono, “PEMBUATAN MEDIA TEKNIK PENGUKURAN PRODUKTIVITAS PEKERJA TERINTEGRASI PADA PERANGKAT PENGAMAT WAKTU,” Prosiding Seminar Nasional Teknoin, 2008, Accessed: Aug. 22, 2024. [Online]. Available: https://journal.uii.ac.id/Teknoin/article/view/2122
T. N. Ramadhani, “Analisis Keterlambatan Pengiriman Barang Sampai Ke Konsumen di Kantor Pos Bandar Lampung Menggunakan Metode Fishbone,” Madani: Jurnal Ilmiah Multidisiplin, vol. 1, no. 5, Jun. 2023, doi: 10.5281/zenodo.8015973.
R. Rosihin, M. Ma’arij, D. Cahyadi, and S. Supriyadi, “Analisa Perbaikan Tata Letak Gudang Coil dengan Metode Class Based Storage,” Jurnal INTECH Teknik Industri Universitas Serang Raya, vol. 7, no. 2, pp. 166–172, Dec. 2021, doi: 10.30656/INTECH.V7I2.4036.
A. Y. Pradana and F. Pulansari, “Analisis Pengukuran Waktu Kerja dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi di PT. XYZ,” JUMINTEN, vol. 2, no. 1, pp. 13–24, Jan. 2021, doi: 10.33005/JUMINTEN.V2I1.217.
A. S. Ramadhani, “Pengukuran waktu baku dan analisis beban kerja untuk menentukan jumlah optimal tenaga kerja pada proses cetak produk lipstick”.
I. Nurjaman, “ANALISIS PENGUKURAN KERJA PRODUKSI DENGAN MENGGUNAKAN METODE TIME STUDY DI UKM SANDAL CAMEL MANGKUBUMI TASIKMALAYA,” Jurnal Media Teknologi, vol. 7, no. 1, pp. 49–62, Mar. 2020, doi: 10.25157/JMT.V7I1.2633.
P. V. Aysyiawan and H. F. Satoto, “ANALISIS PENGUKURAN WAKTU KERJA DAN BEBAN KERJA MENTAL GUNA MENENTUKAN TENAGA KERJA YANG OPTIMAL PADA CV. XYZ,” Senakama: Prosiding Seminar Nasional Karya Ilmiah Mahasiswa, vol. 1, no. 1, pp. 183–192, Oct. 2022, Accessed: Aug. 22, 2024. [Online]. Available: https://conference.untag-sby.ac.id/index.php/sentek/article/view/1157
I. Ketut Wijaya, ; I Nyoman, A. Putra, ; I Made Sutajaya, and R. S. Hartati, “Ergonomic Redesign of Computer Laboratory to Improve Electric Power Performance and Working Efficiency”.
A. Sugiatna and I. F. Pasaribu, “PERHITUNGAN WAKTU BAKU UNTUK MENENTUKAN JUMLAH TENAGA KERJA OPTIMAL MENGGUNAKAN METODE TIME STUDY (Studi Kasus: UKM Baju Rajut Binong Jati),” Sistemik : Jurnal Ilmiah Nasional Bidang Ilmu Teknik, vol. 12, no. 1, pp. 40–49, Jul. 2024, Accessed: Aug. 22, 2024. [Online]. Available: https://sistemik.sttbandung.ac.id/index.php/sistemik/article/view/110
A. V. Baharuddin, W. H. Afris, D. Yusnita, and I. Saputri, “Pengukuran Waktu Kerja Standar pada Proses Produksi di IKM Donat Kampar Galesong,” Journal of Agro-industry Engineering Research , vol. 1, no. 1, pp. 58–62, Jun. 2022, doi: 10.61844/JAIER.V1I1.138.
A. Latief, P. F. Melu, I. H. Lahay, and H. Hasanuddin, “Pengukuran Waktu Kerja Karyawan pada Pengemasan Es Kristal Menggunakan Metode Time Study,” Jambura Industrial Review (JIREV), vol. 1, no. 2, pp. 48–57, Nov. 2021, doi: 10.37905/JIREV.V1I2.11680.
M. Muzakir, H. T. Irawan, and I. Pamungkas, “PENGUKURAN WAKTU KERJA KARYAWAN BENGKEL TOYOTA PT. DUNIA BARUSA DI KOTA BANDA ACEH,” Jurnal Optimalisasi, vol. 4, no. 1, pp. 21–29, Dec. 2019, doi: 10.35308/JOPT.V4I1.1487.
“PEDOMAN PERHITUNGAN KEBUTUHAN PEGAWAI BERDASARKAN BEBAN KERJA DALAM RANGKA PENYUSUNAN FORMASI PEGAWAI NEGERI SIPIL”.
A. Wanri, S. Rahayu, and A. Trigono, “Analisis Kebutuhan Tenaga Administrasi Berdasarkan Beban Kerja Dengan Teknik Work Sampling Menggunakan Metode WISN Dalam Rangka Meningkatkan Mutu Pelayanan Unit Rawat Jalan Rs. Dr. Bratanata Jambi Tahun 2018,” Jurnal Kesmas Jambi, vol. 2, no. 2, pp. 20–32, Sep. 2018, doi: 10.22437/JKMJ.V2I2.6551.
J. Hasil Penelitian dan Karya Ilmiah et al., “Optimalisasi Jumlah Kebutuhan Tenaga Kerja pada Stasiun Kerja Hoisting Crane Menggunakan Metode Work Sampling (Studi Kasus: PT. X),” Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri, vol. 5, no. 2, pp. 125–129, Feb. 2020, doi: 10.24014/JTI.V5I2.8984.
D. A. Santoso and A. Supriyadi, “PERHITUNGAN WAKTU BAKU DENGAN METODE WORK SAMPLING UNTUK MENENTUKAN JUMLAH TENAGA KERJA OPTIMAL”.
DOI: http://dx.doi.org/10.30870/vanos.v9i2.28653
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution 4.0 International License.